Projects I actually worked on, on site
Process control
Hydrometallurgy plant and Danjiangwu Phase II wastewater treatment station control system
Apr 2025 — Sep 2025
Hydrometallurgy automation project: centralized Siemens PCS 7 monitoring of process flows, equipment status, alarms and key process parameters.
PCS 7 supervisory-screen configuration, field commissioning, logic testing and troubleshooting.
Put wastewater and hydrometallurgy flows, alarms and key parameters into PCS 7 screens, so troubleshooting starts with the process and alarm screens instead of guesswork.
View case studyProcess control
15KM Guangqing pyrometallurgy / Lanyan Guangqing acid plant project
Oct 2025 — May 2026
In the early stage of the pyrometallurgy project, I handled equipment wiring, loop checks, operation checks and fault handling on site — getting the basic commissioning right before integrated commissioning.
Early-stage wiring, field commissioning and troubleshooting. Technical mentoring, practical training and safety training for local staff.
With the early wiring, loop checks and fault handling done, integrated commissioning had a solid site base to build on.
View case study