Projects
Projects I actually worked on, on site
Process control
Hydrometallurgy plant and Danjiangwu Phase II wastewater treatment station control system
Apr 2025 — Sep 2025
Hydrometallurgy automation project: centralized Siemens PCS 7 monitoring of process flows, equipment status, alarms and key process parameters.
PCS 7 supervisory-screen configuration, field commissioning, logic testing and troubleshooting.
Put wastewater and hydrometallurgy flows, alarms and key parameters into PCS 7 screens, so troubleshooting starts with the process and alarm screens instead of guesswork.
View case studyPharmaceutical utilities
Pharmaceutical clean-utility engineering (Nuotai Aosainuo / Wanbang Biopharma)
Feb 2022 — Feb 2024
Clean HVAC controls and integration of glycol, pure steam, purified-water preparation and compressed-air systems.
Instrument and equipment installation and commissioning, control-system programming, project commissioning lead and PCS 7 screen modifications.
View case studyProcess control
15KM Guangqing pyrometallurgy / Lanyan Guangqing acid plant project
Oct 2025 — May 2026
In the early stage of the pyrometallurgy project, I handled equipment wiring, loop checks, operation checks and fault handling on site — getting the basic commissioning right before integrated commissioning.
Early-stage wiring, field commissioning and troubleshooting. Technical mentoring, practical training and safety training for local staff.
With the early wiring, loop checks and fault handling done, integrated commissioning had a solid site base to build on.
View case studyCustom equipment
Single-slide robotic screw-fastening equipment
Jan 2025 — Feb 2025
Screw fastening for lamp inner and outer housings, with material-presence and screw-status detection.
Turnkey electrical wiring and fixture commissioning for a custom press line — delivered production-ready.
View case studyCustom equipment
Press workstation
Dec 2024 — Jan 2025
Press fitting of clips between exterior automotive grilles and inner shells, with independent zone pressure control and monitoring.
Turnkey electrical wiring and fixture commissioning for a custom press line — delivered production-ready.
View case studyCustom equipment
Rear combination-lamp optical inspection station
Nov 2024 — Dec 2024
Fixture-code model identification and inspection of brightness, illuminated area and voltage stability, with vision-assisted verification.
Whole-machine wiring and commissioning.
View case studyCustom equipment
Rear combination-lamp leak-testing station
Sep 2024 — Oct 2024
The ST06 station identifies the lamp model from its fixture code and selects the corresponding test pressure.
Whole-machine wiring and commissioning.
View case studyCustom equipment
Double-ended stud gluing and fastening workstation
Jun 2024 — Aug 2024
Joins front combination lamps to housings through hole positioning, gluing, stud feeding and fastening; two rotary stations can run concurrently.
Customized solution implementation, whole-machine solution commissioning and on-site technical support.
View case studyCustom equipment
Lamp aging-test workstation
Apr 2024 — May 2024
Individual lamp aging times, voltage and current monitoring, with touchscreen display and historical records.
Electrical component selection, software-function planning, whole-machine wiring and commissioning.
View case study