15KM Guangqing pyrometallurgy / Lanyan Guangqing acid plant project
Oct 2025 — May 2026
Background
In the early stage of the pyrometallurgy project, I handled equipment wiring, loop checks, operation checks and fault handling on site — getting the basic commissioning right before integrated commissioning.

Responsibilities
- Early-stage wiring, field commissioning and troubleshooting.
- Technical mentoring, practical training and safety training for local staff.
Actions
- Supported site construction, confirmed wiring and checked equipment operation.
Outcomes
- With the early wiring, loop checks and fault handling done, integrated commissioning had a solid site base to build on.