Electrical & automation
- EPLAN / CAD schematic reading and drawing
- Control cabinet fabrication, wiring and component selection
- Structured PLC programming (Siemens incl. PCS7, Mitsubishi, Omron) · SCL/ST · HMI configuration
Electrical Technician · Field engineer certified in high/low-voltage work and Siemens project management
Between jobs — open to overseas field & commissioning roles
Siemens PCS 7 configuration, field commissioning and custom-equipment wiring.
Full résumé and contact details require human verification
Wiring, configuration and troubleshooting — the day-to-day work
Process control
Apr 2025 — Sep 2025
Hydrometallurgy automation project: centralized Siemens PCS 7 monitoring of process flows, equipment status, alarms and key process parameters.
PCS 7 supervisory-screen configuration, field commissioning, logic testing and troubleshooting.
Put wastewater and hydrometallurgy flows, alarms and key parameters into PCS 7 screens, so troubleshooting starts with the process and alarm screens instead of guesswork.
View case studyPharmaceutical utilities
Feb 2022 — Feb 2024
Clean HVAC controls and integration of glycol, pure steam, purified-water preparation and compressed-air systems.
Instrument and equipment installation and commissioning, control-system programming, project commissioning lead and PCS 7 screen modifications.
View case studyProcess control
Oct 2025 — May 2026
In the early stage of the pyrometallurgy project, I handled equipment wiring, loop checks, operation checks and fault handling on site — getting the basic commissioning right before integrated commissioning.
Early-stage wiring, field commissioning and troubleshooting. Technical mentoring, practical training and safety training for local staff.
With the early wiring, loop checks and fault handling done, integrated commissioning had a solid site base to build on.
View case studyCabinets, process screens and the wastewater plant — all photographed on site. Scroll sideways →








Once the process is on the HMI, troubleshooting has something to go on
Delivered visualized monitoring of complex production flows, markedly improving troubleshooting efficiency and equipment-status accuracy.
Press-workstation capacity
Lamp aging-test capacity
—
Automation Electrician
Fire- and hydrometallurgy plus wastewater stations: secondary wiring, point-to-point checks and insulation testing of LV power and VFD cabinets; PCS 7 supervisory configuration and field commissioning.
—
Electrical Technician
Installation, commissioning and optimization of custom automation equipment, ensuring stable pre-shipment operation to customer requirements.
—
Electrical Technician
Pharma clean-utility and control systems: site preparation and standards-compliant wiring; commissioning of PLCs, instruments, VFDs, servo drives and control systems.
Jiangxi Jiujiang Open University · Electrical Automation Technology · Currently enrolled
I'm Xue Xiangzheng, an electrical technician with five years on the job. For the past year and more I was based at IWIP Indonesia, working on pyrometallurgy, hydrometallurgy and wastewater-treatment projects. My day-to-day work ran from LV cabinet secondary wiring, loop checks and pre-energization insulation tests to PCS 7 HMI configuration and on-site troubleshooting. On site, the slowest part is usually not the wiring itself — it's finding the one wire that was landed wrong.
I moved the process flow diagrams into the company's management platform, so people on site could check flows and equipment status without going back to the drawings again and again. I also trained local Indonesian staff hands-on; everyday Indonesian is fine for me.
Back in China now, looking for the next overseas posting or commissioning role.
Open to field commissioning and industrial automation opportunities — recruiters and project teams are welcome to reach out.
Full contact details (phone/WeChat) are access-code protected in the complete résumé.